Trusted for 190 years        Free Shipping on Orders $40+       Fast & Reliable Delivery
Magnum

Long Lead EDC

$44.95 *

* Sales tax and shipping costs will be charged separately.

Not available

  • Magnum
  • Pocket Knives
  • 7.24 in
  • 3.15 in
  • 0.11 in
  • 2.75 oz
  • 440B
  • G10
  • Nail Nick
  • Manual
  • Slipjoint
  • Asia
  • Black
  • Uncoated
  • 01SC080
Laser Engraving
Frontside (+ $9.95 / *)
reset
Backside (+ $9.95 / *)
reset
Father's Day Logo (+ $9.95 / *)
reset
Mother's Day Logo (+ $9.95 / *)
reset
Valentine's Day Logo (+ $19.95 / *)
reset
Kitchen & BBQ (+ $9.95 / *)
reset
* Required field
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint...read more
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 440B stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).
Read, write and discuss reviews...Read or write reviews
Reviews for "Long Lead EDC"
Write a review
Reviews will be activated after a verification.
Wenn Sie sich Anmelden könnten Sie einen Gutschein für ihre Bewertung erhalten

The fields marked with * are required.

01bo343
Boker Plus Kwaiken Air G10 Jade

Available

  • Pocket Knives
  • VG-10
  • G10
  • Lucas Burnley
  • Linerlock
  • Flipper
$175.95 *

Magnum

Magnum - Maximum choice. Maximum value.

Magnum offers an extensive lineup of knives – from timeless pocket knives and rugged hunting blades to modern tactical designs. Renowned for its unbeatable price-performance ratio, Magnum combines German design expertise with efficient international production. The result: knives that impress with style, function, and affordability.

Why choose Magnum?

  • Best Value – Premium design at an accessible price.
  • Stylish & Functional – Wide range of materials and finishes.
  • Endless Variety – Traditional, hunting, and tactical knives.
  • Global Strength – Designed in Germany, crafted in Asia.

Magnum - Maximum choice. Maximum value.

Magnum offers an extensive lineup of knives – from timeless pocket knives and rugged hunting blades to modern tactical designs.... more

Show products